Customization: | Available |
---|---|
After-sales Service: | Follow The Warranty Manual for After-Sales Service |
Warranty: | Follow The Warranty Manual for After-Sales Service |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Introducing the ME150.9 Excavator: expertly crafted to tackle even the most challenging earthworks with precision and power.
Featuring a robust and highly efficient engine, this excavator delivers remarkable energy savings and optimal economic performance, significantly enhancing the engine's overall capabilities.
Equipped with a globally acclaimed hydraulic system, this machine guarantees exceptional durability and reliable performance under any conditions.
Engineered for resilience, the structural design of this excavator's working device ensures it can withstand the toughest of tasks with ease.
Experience ultimate comfort with our excavator's spacious cabin, complete with air conditioning and USB ports, designed for a serene and practical working environment.
MODEL | ME150.9 |
Operating weight (T) | 14.5 |
Bucket capacity (m3) | 0.6 |
Engine model | FukangQSF3.8 |
Rated power (kw/r/min) | 86/2200 |
Volume of fuel tank (L) | 247 |
Travel speed (km/h) | 5.3/3.1 |
Swing speed(r/min) | 12 |
Max climbing degree° | 70 |
Bucket digging force at *** (KN) ISO | 100 |
Average grounding pressure(KPA) | 39 |
Hydraulic pump model | InLine HP3V75 |
Maximum flow (L/min) | 165*2 |
Setting pressure (MPa) | 37 |
Volume of hydraulic tank (L) | 130 |
A Overall length (mm) | 7580 |
B Overall width (mm) | 2490 |
C Overall height (to top of boom)(mm) | 2780 |
D Overall height (to top of cab)(mm) | 2815 |
E Counterweight ground clearance (mm) | 870 |
F Min. ground clearance (mm) | 430 |
G Tail swing radius (mm) | 2155 |
H Track grounding length (mm) | 3000 |
J Track length (mm) | 3735 |
K Track gauge(mm) | 2000 |
L Track width (mm) | 2500 |
M Track shoe width (mm) | 500 |
Q: How long is the machine warranty time?
A: One year.
Q: Are you original manufacturer?
A: Yes. We are manufacturer of construction machines.
Q: What is the terms of payment?
A: :Normally, we accept 30% advance, 70% should be paid after finished the machine, L/C at sight.
Q: What is the delivery time ?
A: Generally we need 3-5 days to produce the machine after prepayment ,if you are urgent , 2 days will be ok ,then send to port.
Q: How should we do if the machine broken ?
A: You can take a video to us and our technicians will analyze the cause of the problem based on the video.