Customization: | Available |
---|---|
After-sales Service: | Follow The Warranty Manual for After-Sales Service |
Warranty: | Follow The Warranty Manual for After-Sales Service |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
The ME150.9 Excavator machine is your ideal partner for tackling complex earthwork projects with ease and precision.
Experience unmatched efficiency and energy savings with its powerful engine. This engineering marvel boasts optimal economic adjustments to significantly elevate engine performance.
Rely on the world-renowned hydraulic system that guarantees exceptional durability and reliable performance of the product.
Designed with robust structural integrity, this working device excels in enduring the toughest of work conditions.
Enjoy the luxury of a spacious and comfortable cabin, featuring air conditioning and USB ports for maximum convenience.
MODEL | ME150.9 |
Operating weight (T) | 14.5 |
Bucket capacity (m3) | 0.6 |
Engine model | FukangQSF3.8 |
Rated power (kw/r/min) | 86/2200 |
Volume of fuel tank (L) | 247 |
Travel speed (km/h) | 5.3/3.1 |
Swing speed(r/min) | 12 |
Max climbing degree° | 70 |
Bucket digging force at *** (KN) ISO | 100 |
Average grounding pressure(KPA) | 39 |
Hydraulic pump model | InLine HP3V75 |
Maximum flow (L/min) | 165*2 |
Setting pressure (MPa) | 37 |
Volume of hydraulic tank (L) | 130 |
A Overall length (mm) | 7580 |
B Overall width (mm) | 2490 |
C Overall height (to top of boom)(mm) | 2780 |
D Overall height (to top of cab)(mm) | 2815 |
E Counterweight ground clearance (mm) | 870 |
F Min. ground clearance (mm) | 430 |
G Tail swing radius (mm) | 2155 |
H Track grounding length (mm) | 3000 |
J Track length (mm) | 3735 |
K Track gauge(mm) | 2000 |
L Track width (mm) | 2500 |
M Track shoe width (mm) | 500 |
Q: How long is the machine warranty time?
A: One year.
Q: Are you original manufacturer?
A: Yes. We are manufacturer of construction machines.
Q: What is the terms of payment?
A: :Normally, we accept 30% advance, 70% should be paid after finished the machine, L/C at sight.
Q: What is the delivery time ?
A: Generally we need 3-5 days to produce the machine after prepayment ,if you are urgent , 2 days will be ok ,then send to port.
Q: How should we do if the machine broken ?
A: You can take a video to us and our technicians will analyze the cause of the problem based on the video.