Customization: | Available |
---|---|
After-sales Service: | Follow The Warranty Manual for After-Sales Service |
Warranty: | Follow The Warranty Manual for After-Sales Service |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Introducing the ME150.9 Excavator machine, a powerhouse designed to conquer complex earthwork challenges with ease and efficiency.
Our excavator boasts a powerful and efficient engine, masterfully engineered for exceptional energy savings. This dynamic engine perfectly aligns with optimal economic adjustments, significantly enhancing overall performance.
Equipped with a world-renowned hydraulic system, this excavator ensures unmatched reliability and durability, setting a new standard in hydraulic excellence.
With a robust structural design, our working device is engineered to endure rough and demanding work conditions, providing unparalleled strength and resilience.
Experience ultimate comfort in our excavator's spacious cabin, complete with air conditioning and USB ports, ensuring a luxurious and productive environment.
MODEL | ME150.9 |
Operating weight (T) | 14.5 |
Bucket capacity (m3) | 0.6 |
Engine model | FukangQSF3.8 |
Rated power (kw/r/min) | 86/2200 |
Volume of fuel tank (L) | 247 |
Travel speed (km/h) | 5.3/3.1 |
Swing speed(r/min) | 12 |
Max climbing degree° | 70 |
Bucket digging force at *** (KN) ISO | 100 |
Average grounding pressure(KPA) | 39 |
Hydraulic pump model | InLine HP3V75 |
Maximum flow (L/min) | 165*2 |
Setting pressure (MPa) | 37 |
Volume of hydraulic tank (L) | 130 |
A Overall length (mm) | 7580 |
B Overall width (mm) | 2490 |
C Overall height (to top of boom)(mm) | 2780 |
D Overall height (to top of cab)(mm) | 2815 |
E Counterweight ground clearance (mm) | 870 |
F Min. ground clearance (mm) | 430 |
G Tail swing radius (mm) | 2155 |
H Track grounding length (mm) | 3000 |
J Track length (mm) | 3735 |
K Track gauge(mm) | 2000 |
L Track width (mm) | 2500 |
M Track shoe width (mm) | 500 |
Q: How long is the machine warranty time?
A: One year.
Q: Are you original manufacturer?
A: Yes. We are manufacturer of construction machines.
Q: What is the terms of payment?
A: :Normally, we accept 30% advance, 70% should be paid after finished the machine, L/C at sight.
Q: What is the delivery time ?
A: Generally we need 3-5 days to produce the machine after prepayment ,if you are urgent , 2 days will be ok ,then send to port.
Q: How should we do if the machine broken ?
A: You can take a video to us and our technicians will analyze the cause of the problem based on the video.