Customization: | Available |
---|---|
After-sales Service: | Follow The Warranty Manual for After-Sales Service |
Warranty: | Follow The Warranty Manual for After-Sales Service |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Basic parameters MEL880
Engine model | YCAA105Z 4BTA3.9-C100-ll |
Total power/speed (kW/rpm) | 75/2200 74/2200 |
Total length of the entire machine (mm) | 6355 |
Total width (mm) | 2400 |
Total height (mm) | 3700 |
Minimum ground clearance (mm) | 362 |
Work mass (kg) | 9250 |
Front wheel width (mm) | 2230 |
Multi-functional bucket (four-in-one loading bucket), standard loading bucket
Engine model: YCAA105Z 4BTA3.9-C100-II
Total power/speed (kW/rpm): 75/2200, 74/2200
Total machine length (mm): 6355
Total width (mm): 2400
Total height (mm): 3700
Minimum ground clearance (mm): 362
Working mass (kg): 9250
Front wheel width (mm): 2230
Rear wheel width (mm): 2295
Lifting load at maximum height (kN): 34
Bucket digging force (kN): 58
Bucket capacity (m³): 1
Bucket width (mm): 2365
Bucket weight (kg): 867
Excavation deflection angle: 180°
Max digging force of bucket handle (kN): 43/42/30.4
Max excavation force of excavator bucket (kN): 73.1/72.2/72.2
0.32m³ excavator bucket width (mm): 690
Bucket weight (kg): 260
The visionary founder and dedicated teams at Maxpower boast over 30 years of unrivaled expertise in the realm of construction machinery design, manufacturing, and sales. Since the 1990s, they have been shaping the industry with their groundbreaking work for internationally renowned construction machinery giants in China. In 2004, their entrepreneurial spirit led them to branch out and expand their prowess from mini-size machinery to large-scale mining excavators. By 2015, they forged the Jining Maxpower Construction Machinery Company, revolutionizing the landscape with innovative products like rotary drilling rigs, piledrivers, and material handling machinery. As an elite professional company, we proudly deliver wheel loaders, bulldozers, and wheel excavators, ensuring unparalleled support for our esteemed clients. Maxpower's exceptional products now grace over 30 countries worldwide, a testament to our commitment to excellence.
Nestled in the heart of the domestic construction machinery manufacturing hub, Jining High-tech Zone, we are endowed with superior manufacturing prowess, unmatched resource support, and a wealth of human resources. Our strategic location amplifies our capacity to deliver remarkable machinery solutions.
Q: How long is the machine warranty time?
A: One year.
Q: Are you original manufacturer?
A: Yes. We are manufacturer of construction machines.
Q: What is the terms of payment?
A: :Normally, we accept 30% advance, 70% should be paid after finished the machine, L/C at sight.
Q: What is the delivery time ?
A: Generally we need 3-5 days to produce the machine after prepayment ,if you are urgent , 2 days will be ok ,then send to port.
Q: How should we do if the machine broken ?
A: You can take a video to us and our technicians will analyze the cause of the problem based on the video.
Q: How should we do if parts are broken ?
A: We advise customers to purchase some conventional accessories based on their country and environment. If other parts broke ,we will send to you by sea or by air.
Q: Can the machine use the trademark of our own company?
A: Yes ,sir ,of course.